Construction and precommissioning of 12-inch by 48km gas transmission pipeline.
Construction and precommissioning of 12-inch by 48km gas transmission pipeline in the swamp of Calabar to UNICEM Factory.
Client: MJD Oilservices Ltd. Year of contract: 2011.
01.01.2011
31.12.2011